South Australia Critical Minerals Projects

Linda Zinc Project (EL 6263)

Based in the Flinders Ranges which covers 190km². The project is underlain by Neoproterozoic to early Cambrian sedimentary rocks.

Stelar considers this area prospective for MVT and Beltana-Kipushi type zinc-lead mineralisation as well as Zambian style copper mineralisation.

Gunson Project (EL 6812)

Located 2km from a series of open pit copper mines and deposits at Mount Gunson, which were periodically mined from 1875 through to 2006.

The section of the ELA beside Mount Gunson may be prospective for extensions of the Mount Gunson mineralisation as well as mineralisation hosted in the Tapley Hill Formation (THF).

Evelyn Dam Project (EL 5792)

Covers 134km² about 50km south of Woomera in South Australia.

The project area is underlain by Palaeoproterozoic to Mesoproterozoic basement, prospective for Olympic Dam style iron oxide copper gold (IOCG) mineralisation.

Wynbring Project (EL 7065)

Covers a large 327km2 area located 75km west of Tarcoola township.

Wynbring is considered prospective for titanium-rich Heavy Mineral Sands (HMS) with a similar geological setting to Petratherm and Marmota’s nearby Muckanippie HMS Projects.