Hill of Leaders Tungsten Project

The Hill of Leaders Tungsten Project is located on exploration licence EL33232 covering a large 445km2 prospective area in the world-class Tennant Creek mining region of the Northern Territory. The project is well serviced by infrastructure, located approximately 50km from the Stuart Highway and rail connecting the project to Darwin and Darwin Port.

The project sits within the Tennant Creek Inlier, a highly mineralised terrane that hosts several significant copper-gold deposits, with the area also hosting nearby comparable tungsten deposits.

Tungsten (with associated copper) mineralisation at Hill of Leaders is hosted within quartz veins, alteration zones and greisen intruding the Hill of Leaders Granite. Mineralisation presents as a swarm of multiple, stacked, narrow quartz veins and surrounding alteration zones and greisen. While individual veins are typically less than 30cm wide and 200m long, collectively they form a massive swarm that is over 100m wide and at least 2km in length.